Working list of confirmed in-canon prices, kept as a calibration reference when inventing new prices for equipment, goods, wages, or services. Not exhaustive — pull more data points from canon/equipment/cards/ and similar sources as needed, and add them here.

Technological context

Pricing across this setting is shaped by widespread, mature 3D printing / additive manufacturing:

  • Structural & mechanical components are comparatively cheap. Printing removes most of the tooling and labor cost normally associated with complex mechanical parts — what would be an expensive custom structure or mechanism elsewhere is routine and low-cost here.
  • Simple electronics are comparatively cheap for the same reason — mass, automated, low-marginal-cost production.
  • In construction, raw building/shell cost is cheap relative to fit-out. 3D printing extends to construction itself, so erecting a structure is a small fraction of a project’s cost; the expensive part is the equipment and systems fitted into it (which may themselves be factory/printed, but are still the cost driver — see the reactor/equipment lines in the shipyard example below, which dwarf the hull cost).

When inventing a new price, weight it toward “structure/hull/building is cheap, equipment/electronics/systems are where the money goes” unless there’s a specific reason (exotic material, low production volume, cutting-edge tech) to break that pattern.

How to add an entry

- **Name** (`EQUIP_ID`) — unit cost CURRENCY — one-line category/role note — [source](relative/path.md)
  • Group entries by rough category (vehicles, ships, small arms, wages, goods, services, …).
  • Within a category, order low to high cost — it makes the scale easier to eyeball.
  • Always include currency; do not assume AC (Artalan Credit) applies outside Artalan-sourced items — other polities use their own currencies (see canon/states/STATE_*.md).
  • Keep notes short; the source link is where the real detail lives.
  • Cross-manufacturer comparison convention: when a price spans multiple producers/states (e.g. shuttle or warhead cost comparisons), default to CC (Commonwealth Credit) as the common unit, and only use AC for a figure specifically sourced to Artalan.
  • A tight multi-producer comparison (e.g. cost by manufacturer) may use a small markdown table instead of bullets — keep it next to a bullet note giving the shared currency/unit.
  • Exchange rate: 1 AC ≈ 1 CC — treat AC and CC figures as directly comparable without conversion.
  • Artalan pricing bias, refined: Artalan is cheaper only where it plays to the mechanical/simple-electronics/domestic-production strength described in Technological context — ground vehicles, structural components, basic gear. For anything requiring imported advanced electronics (EW/sensor systems, complex avionics), Artalan is pricier than the general/foreign figure, not cheaper — see the note under Defensive platforms. When calibrating a new Artalan price, ask “is this domestically-buildable mechanical/simple-electronic hardware, or does it need imported high-end electronics?” before assuming the discount applies.

Wages & salaries (Artalan, AC)

  • Average annual salary, 2455 — 31 800 AC/year — economy-wide average, not military- or role-specific

Ground vehicles & equipment (Artalan, AC)

Figures below are manufacturer catalog prices — list price including standard producer margin, not government contract/procurement cost and not adjusted for bulk-order discounts.

  • LKW “Atlas” Model 3 (GROUND_TRUCK_ATLAS) — 60 000 AC — unarmed cargo truck — card
  • LKW “Żubr” Model 1 (GROUND_TRUCK_ZUBR) — 85 000 AC — unarmed cargo truck — card
  • GSfz “Spartan” (GROUND_UTIL_SPARTAN) — 95 000 AC — light utility/scout vehicle — card
  • GSfz.Ausf.2 “Spartan-2” (GROUND_UTIL_SPARTAN2) — 100 000 AC — specialist-variant utility vehicle family — card
  • TPz.Ausf.1 “Schutzhund” (GROUND_IFV_SCHUTZHUND) — 877 500 AC (Ausf.1) / 925 000 AC (Ausf.1b) — IFV; Ausf.1a upgrade retrofit adds 60 000 AC per vehicle — card
  • TPz.Ausf.1b/Fü “Leithund” (GROUND_CMD_LEITHUND) — 942 250 AC (unarmed) / 971 500 AC (RWS with KAMG-1 LMG) / 977 500 AC (RWS with Taran-4) / 995 750 AC (RWS mount with KOMAR SAM launcher, missiles extra) — tracked command vehicle on the Schutzhund Ausf.1b hull — card
  • PzStG.Ausf.1 “Mściciel” (GROUND_TANK_MSCICIEL) — 1 377 000 AC — tank destroyer / assault gun — card
  • GPz.Ausf.3/Aufkl “Onyx-Aufklärer” (GROUND_RADAR_ONYXAUFKLARER) — 1 000 000 AC — reconnaissance radar vehicle — card
  • GPz.Ausf.4/Aufkl “Onyx-Aufklärer” (GROUND_RADAR_ONYX4AUFKL) — 1 050 000 AC — reconnaissance radar vehicle, upgraded chassis — card
  • FLT.Ausf.1 “Światowid” (GROUND_RADAR_SWIATOWID) — 2 180 000 AC — standalone fire-control radar; costliest ground system logged so far — card

Personal equipment (per soldier)

Not yet tied to a specific canon card. Costs split by tech tier (high-tech vs. low-tech loadout) where they differ.

Artalan-sourced (AC)

  • Basic personal gear (hygiene kit, PDA, utensils, backpack, tactical belt, repair kit) — 3 000 AC — same across tiers
  • Combat suit (anti-shrapnel) — 2 500 AC — same across tiers
  • Artalan-sourced subtotal — 5 500 AC per soldier

Anann import (CC)

  • Body armor (“FPC” pattern; sensors/HUD/comms/tactical assistant) — 20 000 CC (high-tech) / 12 000 CC (low-tech)
  • Personal weapons (caseless rifle, integrated grenade launcher, squad-weapon share) — 12 000 CC (high-tech) / 8 000 CC (low-tech)
  • Ammunition loadout — 5 500 CC (high-tech) / 2 000 CC (low-tech)
  • Anann-import subtotal — 37 500 CC (high-tech) / 22 000 CC (low-tech)

Small arms — Artalan militia tender comparison (AC)

Not yet tied to dedicated equipment cards — these are catalog-only lines per canon/equipment/README.md. Three Artalan manufacturers (Armstrong Arms, Sentinel Munitions, Kresy Arsenal) competed for the 2454 militia small-arms contract with parallel caseless-ammunition weapon families; prices are confirmed even where technical specs (caliber, magazine, fire modes) aren’t yet. All domestically designed and produced — consistent with the cheap-domestic/expensive-import split elsewhere in this document (compare to the Anann-import personal weapons bundle above).

Weapon classArmstrong ArmsSentinel MunitionsKresy Arsenal
RifleAA-R54 — 5 500 AC (adopted 2454)R1-Orion — 4 000 AC (prototype)KAR-1 — 5 000 AC (prototype, lost tender)
PDWAA-C54 — 3 500 AC (adopted 2454)P1-Perseus — 2 000 AC (limited service, PMC use)KAS-1 — 3 000 AC (prototype, lost tender)
LMGAA-M56 — 9 600 AC (prototype, lost tender)S1-Achilles — 8 500 AC (adopted 2454)KAMG-1 — 9 000 AC (prototype, lost tender)
HMGAA-H56 — 20 000 AC (adopted 2454)H1-Hercules — 17 600 AC (prototype)KAHG-1 — 18 500 AC (prototype)
Light ATAA-AT01 — 10 500 AC (prototype)L1-Sagitta — 8 800 AC (prototype)KAT-1 — 9 300 AC (adopted 2454)

Kresy Arsenal also has a heavy AT weapon on order (KAHT-1, price not yet established) and a guided-rocket/MANPAD line (KARP rocket pods; the KOMAR air-defence system (adopted 2454) — MANPAD, vehicle launcher and missiles, 3 500–40 000 AC depending on component) — see canon/equipment/catalogs/CATALOG_KRESY_ARS.md directly if calibrating against those.


Missiles & munitions (Artalan, AC)

Not yet tied to a specific canon card.

  • Land mine — 200 AC
  • Unguided medium-caliber rocket (APC-mounted) — 200 AC
  • 60 kg bomb — 300 AC
  • 250 kg HE bomb — 900 AC
  • 60 kg glide bomb — 1 000 AC
  • 500 kg HE bomb — 1 800 AC
  • 250 kg cluster bomb — 2 000 AC
  • 250 kg HE glide bomb — 2 500 AC
  • 250 kg cluster glide bomb — 3 500 AC
  • 500 kg HE glide bomb — 4 000 AC
  • 500 kg cluster bomb — 4 000 AC
  • 500 kg cluster glide bomb — 6 000 AC
  • MLRS missile — 10 000 AC

Military infrastructure (Artalan, AC)

Not yet tied to a specific canon card.

  • Battalion base expansion (doubling size) — 30 000 000 AC
  • Underground anti-space missile silo — 50 000 000 – 100 000 000 AC — range depends on how remote the site is

Fuel & materials (CC)

Not yet tied to a specific canon card.

  • He-3 fuel mix (paliwo He-3) — 100 000 AC/kt (≈100 AC/t) — not pure He-3: reactor and fusion-drive fuel blended with added mass (water or hydrocarbons); Helix-One (HOM) output — corp
  • Czechium — 25 000 000 CC/kg — generator fuel; typically sold in batches of 1 000 pellets

Freight rates (CC)

Preliminary — a design decision, not yet tied to a card. Average cost of shipping 1 kt of cargo between two systems, planet to planet (one trip: a flight of 2.5 a.u. in each system and a jump). Calibrated so that a new merchant hull, after operating costs (czechium, fuel, crew, maintenance, overhauls, extras), gives its owner a 10% yearly return on his own money: bought with a 4% loan over 20 years (75% of the price, the owner’s 25% earns 10%), or without a loan (the owner puts in the whole price and earns the same 10%), which needs rates about 10–25% higher: bulk 0.16, specialized 0.29, courier 0.87 for the cheapest new hull. About 11–17 trips a year, from the time budget. A route with a trade station at one jump point is about 40% cheaper. Calculations by hull in WIP_freight_cost_calculations (working file).

  • Bulk goods, core worlds (towary masowe, centrum) — 0.10–0.15 mln CC/kt — only large hulls (50 kt and up) repay themselves at this rate: with a loan Nova 0.13, Magnetar 0.14, Quasar 0.14; without a loan 0.16–0.17
  • Specialized goods in small volumes; frontier (towary specjalistyczne, rubieże) — 0.2–0.3 mln CC/kt — mid-size hulls (15–20 kt): with a loan 0.24–0.29, without a loan 0.29–0.35; hulls of 4–10 kt do not repay themselves at this rate
  • Priority / courier (priorytet, kurier) — 0.5–1.0 mln CC/kt — about 0.75–1.0 for planet-planet trips (a new 10 kt hull needs 0.79 with a loan, 0.87 without), about 0.5–0.75 for routes with a trade station at one jump point; the niche of the smallest hulls (4–10 kt), a 4 kt hull pays only as an old, paid-off one

Shuttles / promy (CC unless noted)

Not yet tied to a specific canon card. Ranges reflect variation across manufacturers; per-manufacturer figures noted where given.

  • Small civilian shuttle (mały prom cywilny) — 1.5–2.5 mln CC
  • Small military shuttle (mały prom wojskowy) — 3–4 mln CC (Nilus: 2.5 mln CC / Newton: 4 mln CC)
  • Large military shuttle (duży prom wojskowy) — 5–7 mln CC
  • Large cargo shuttle, 500 t (duży prom towarowy) — 20–40 mln CC
  • Large military shuttle, Sowa class (duży prom wojskowy klasy Sowa) — 25–30 mln CC — stealth variant, low emission profile, built for special operations; intentionally priced far above the baseline large military shuttle, not a data error
  • Shuttle dock with a transport trunk line (dok promowy z magistralą transportową, for cargo shuttles) — 3 mln CC (the port price of the transshipment calculations)
  • Passenger shuttle dock (dok dla małych promów osobowych) — 0.5 mln CC

Nilus note: Nilus is an atmosphere-less system (no planets with an atmosphere), so its shuttles — including the small military shuttle above — are built without atmospheric-entry capability. That’s why the Nilus figure sits at the cheap end of its bracket: when comparing shuttle prices, check whether atmospheric capability is included before treating a low Nilus figure as a general baseline.


Defensive platforms (CC unless noted)

Not yet tied to a specific canon card. Artalan figures given separately in AC per the cross-manufacturer convention above.

  • Container launcher (wyrzutnia kontenerowa) — avg. 300 000 CC (Artalan: 250 000 AC)
  • EW satellite (satelita EW) — 4–6 mln CC (Artalan: 5–7 mln AC)
  • Large platform (EW + containers, or transshipment) — 6–12 mln CC (Artalan: 7–14 mln AC)

Exception to the Artalan-cheaper convention: EW satellite and large platform buck the usual pattern — Artalan is pricier than the general figure here, not cheaper. Reason: these are advanced-electronics/sensor systems, which Artalan imports rather than produces domestically. The “Artalan is cheaper” rule only holds for mechanical/structural items and simple electronics (see Technological context); anything requiring imported advanced electronics should be priced above the general range, not below.


Space missiles by warhead type and manufacturer (mln CC)

Not yet tied to a specific canon card. Figures are the complete missile cost (bus, propulsion, guidance included), named by warhead type — not the warhead alone. NEFP = nuclear explosively formed penetrator; EX = Excalibur-like bomb-pumped laser; LLANC = large lance / casaba howitzer; LANC = small-lance variant of LLANC.

WarheadNilusFaringorRamanYggdrasilNAMS
NEFP0.750.80.750.720.825
EX0.750.90.75—0.825
LLANC0.50.480.50.480.55
LANC0.31250.30.31250.30.34375

Construction costs

Not yet tied to a specific canon card. Large fixed installations, broken down by component.

Base cost per m² — ground construction on Artalan (AC/m²)

First approximation, a design decision. Cost of a finished building in Artalan, construction plus fit-out (wykończenie): 3D-printed shell, cheap land (low population), local contractors. Excludes equipment and systems (situation room, comms, security, servers, AV, specialist machinery), which are priced separately per the “structure is cheap, equipment is where the money goes” rule. Not transferable to off-world or remote sites (e.g. the lunar base below has no atmosphere and long supply lines).

Building typeAC/m²
Detached house (dom jednorodzinny)550–700
Apartment block (blok mieszkalny)800–900
Office / government building (biuro, budynek rządowy)900–1 100
Military base construction, average (koszary, magazyny, socjal, teren)~1 000
Hardened military shelter (schron wojskowy), underground~3 000
  • Military base figure is derived from the battalion base expansion (30 mln AC, ~1 000 soldiers, including barracks, equipment, storage, social areas and green space — see Military infrastructure above); its floor area is not recorded, so treat ~1 000 AC/m² as a rough anchor, not a measurement.
  • Housing check: a 200 m² detached house comes to roughly 110–140 thousand AC, i.e. about 3.5–4.4 average annual salaries (31 800 AC) — in line with US house-price-to-income ratios of a few decades ago (about 3 household incomes), cheaper per m² than an office because it lacks lifts, heavy HVAC and office cabling.
  • Upkeep for comparison (korpo.xlsx, per m² per year): office tower 50 AC, factory 50 AC, studios/offices 65 AC, barracks-type low-sec base 50 AC, high-sec operations base 150 AC, warehouses 10 AC.

Lunar military base (Artalan, mln AC)

ComponentArea (m²)Cost (mln AC)
Living quarters (część mieszkalna)3 0007.5
Common/social area (część socjalna)3 0007.5
Storage (magazyny)5002.5
Workshops & landing-pad support (warsztaty i obsługa lądowisk)1 0003.5
Landing pads (lądowiska)2 0007
Training range (poligon)25 0002.5
Sensors + comms—5
Total35.5

Small shipyard — standard design (mln CC)

A project of an ordinary small shipyard (own reactor, two berths), not a repair yard. For the small repair yard see the next section.

SectionMass (kt)Volume (m³)ComponentCost (mln CC)
Living quarters (część mieszkalna)6.318 000Hull12.6
Equipment10
Comms4
Technical section (część techniczna)410 000Hull8
Reactor100
Equipment25
Correction drive & heat radiators25
Shipyard berth 1 (stocznia)10100 000Hull20
Equipment100
Shipyard berth 2 (stocznia)10100 000Hull20
Total324.6

Small repair shipyard (mln CC)

Reference for a small repair yard such as Trident Shipyard on Nilus. Ranges depend on where it is built, how much is adapted rather than built new, who supplies the equipment and who builds it.

SectionCost (mln CC)
Living quarters (część mieszkalna)10–35
Technical section (część techniczna)35–75
Shipyard section (część stoczniowa)30–50
Total~100+
  • Consistency check: Artalan Corporation’s 30% in Trident Shipyard is valued at 36 mln CC, i.e. ~120 mln CC for the whole yard — see CORP_ARTALAN_CORPORATION.

Body-armor assembly & integration plant (Artalan, mln AC)

  • Plant — 15 mln AC — assembles ~700 body-armor sets/year (with some spare capacity) from Anann-imported subcomponents combined with locally 3D-printed parts; see the Anann-import body armor line under Personal equipment for the per-unit cost this plant is turning into finished sets

Armed forces headquarters — peacetime office building (Artalan, mln AC)

Planned. Peacetime administrative HQ of the Artalan Armed Forces: offices for officers and civilian support staff, offices of the service chiefs, a shared conference hall, smaller meeting rooms, staff rooms. It is not the operational HQ or orbital control, which are separate projects priced later. Designed for about 300 people (about 4% of the target strength of ~7 000; ~3–5% is the staff share assumed for small forces; about 110–180 needed at the current ~3 600) on about 6 000 m² gross (~20 m² per person including meeting rooms, archive, canteen and circulation). Shell and finish at the office rate of 900–1 100 AC/m² (see above); planetary comms and IT cost is driven by secure technology, not power.

ItemCost (mln AC)
Building + basic fit-out (6 000 m²)6.5
Better fit-out (optional)1
Comms, shielding, security2
Shelter + emergency power2
Total10.5 (11.5 with the optional fit-out)

System Defence Centre — wartime operational command (Artalan, mln AC)

Planned. The operational command centre for the defence of the whole system, coordinating all branches; the final (target) operational centre, with the small secret mountain command centre near Caledon kept as a networked backup. Built near Caledon next to, but outside of, the planned ground naval base on the outskirts of the city (cheaper land than in the city, so larger). Wartime centre: the whole operational part sits in a hardened underground shelter (~4 700 m² at ~3 000 AC/m²: operations floor, liaison and planning cells, command suite, data centre, comms hub, life-support and power plant, quarters for ~125, canteen and medical, airlocks), for ~250 people underground in wartime (2 twelve-hour shifts of ~100 on duty plus ~50 shelter support) and ~25–30 per shift in peacetime. Above ground only peacetime buildings for the crew (~3 000 m²) and entrances. Sized for 14–30 days of autonomy; conventional weapons and EMP, not a direct orbital strike.

ItemCost (mln AC)
Shelter construction14
Surface buildings2.5
Equipment5
Computer centre5
Power and life support3
Secure redundant and distributed comms3
Total32.5
  • Planned in MIL_ARTALAN_ARMED_FORCES (Military Infrastructure). Peacetime administrative HQ is priced separately above.

Military academy campus — new campus outside the city (Artalan, mln AC)

Planned. A new campus built outside the city, on a clean site (not on ruins), consisting of four parts. It is a separate project from the park with a military-academy building in the Caledon design competition. Built with the participation of Caledonian University (Uniwersytet Caledoński; no file of its own yet, see its spin-offs PolyTech Dynamics and MarginOfError), which financed part of the buildings and supplies part of the academic staff. Figures assume buying ready-made solutions: equipment cost can be cut by splitting the work into many projects and engaging local subcontractors; simulator cost can go up or down in the same way, depending on development costs. Administrative costs of splitting into many projects come on top.

Construction cost

PartIntakeBuildingsEquipmentSimulatorsTotal
I. Cadet school (podchorążówka) — barracks, lecture halls, some social space and field area100 cadets/year, 1-year course (assumed)2.51.6—4.1
II. Technical academy (akademia techniczna)200/year, 3-year course1322.51045.5
III. Fleet cadet school (podchorążówka floty)20 cadets/year, 3-year course2.5520 (simulators and ship mock-ups)27.5
IV. Fleet technical academy (akademia techniczna floty)100 sailors/year, 3-year course71350 (simulators and ship mock-ups)70
Total2542.180147.1
  • Financed by the university: about 30% of the buildings of the two technical academies, i.e. ~6 mln AC (3.9 in part II, 2.1 in part IV) — research labs and part of the lecture halls, a rough guess (labs cost more per m² than the university’s 25% share of the staff). The military pays 141.1 mln AC (buildings 19, equipment 42.1, simulators 80) and all upkeep.
  • Buildings come to roughly 25 000 m² at the military construction rate of ~1 000 AC/m² (see Base cost per m² above): ~22–23 m² per student in parts II and IV, more per head in the small fleet cadet school.
  • Simulators are over half of the total cost (54%), mostly fleet simulators and ship mock-ups — the usual pattern of cheap buildings and expensive systems.

Operating cost (mln AC/year)

Cadets and sailors are on normal salaries paid from the general personnel budget, so their pay and board are not counted here. Let N = number of students at the campus (design capacity 1 060: 100 + 600 + 60 + 300 in parts I, II, III, IV) and ρ = N ÷ 1 060; ρ roughly follows force strength ÷ the target ~7 000, so about 0.5 now (~3 600 personnel).

Yearly cost of each academy as a function of its own number of students, with research and the university staff included (N = students currently in that academy; “per student” in AC per year):

AcademyDesign NFormula (mln AC/year)FixedPer student (AC)At 50% (now)At 100%
I. Cadet school100K = 0.572 + 0.00498 · N0.574 9800.821.07
II. Technical academy600K = 4.884 + 0.00637 · N4.886 3706.808.71
III. Fleet cadet school60K = 1.282 + 0.01173 · N1.2811 7301.631.99
IV. Fleet technical academy300K = 3.711 + 0.00854 · N3.718 5404.996.27
All four1 060K = 10.45 + 0.00716 · N (N = all students)10.457 16014.218.0
  • Reading the formula: a fixed amount for keeping the academy open (the core pool of staff, upkeep of buildings and equipment, running of the simulators) plus a rate per student (staff above the core, consumables, wear of equipment). Fixed part: 0.57 (I), 4.88 (II), 1.28 (III), 3.71 (IV).
  • Components at the design number of students (fixed + per-student part, mln AC): staff — I 0.35 + 0.23, II 2.80 + 1.87, III 0.42 + 0.28, IV 1.40 + 0.93; research materials — II 0.12 + 0.08, IV 0.06 + 0.04; building upkeep (fixed only) — I 0.125, II 0.65, III 0.125, IV 0.35; equipment — I 0.045 + 0.019, II 0.63 + 0.27, III 0.14 + 0.06, IV 0.364 + 0.156; simulators — II 0.24 + 0.06, III 0.48 + 0.12, IV 1.2 + 0.3; consumables (per student only) — I 0.2, II 1.2, III 0.18, IV 0.9; administration 10% on top.
  • Staff posts (also a function of the number of students): I 16.7 · (0.6 + 0.4 · N/100); II 133 · (0.6 + 0.4 · N/600), of which 25% university posts (33 at full strength); III 20 · (0.6 + 0.4 · N/60); IV 67 · (0.6 + 0.4 · N/300), of which 17 university posts. Total 237 posts at full strength, 142 with no students.
  • Cost per graduate (graduates per year at full strength: I 100, II 200, III 20, IV 100; they scale with N): I ~16 000 AC at 50% and ~11 000 AC at 100%; II ~68 000 and ~44 000; III ~163 000 and ~100 000; IV ~100 000 and ~63 000. More than half of the cost is fixed, so a small intake is expensive per head; the only way to lower the fixed part is to open parts of the campus in stages.
  • Staff posts by employer — at 0 / 50% / 100% of the design number of students (total posts as in the staff-posts line above). Serving army and fleet officers and NCOs take most of the posts in the cadet schools (75–80%: tactics, drill, command, practical training) and about 40% in the technical academies (military specialisations, simulator operation, ship command); the university pool is 25% of the technical academies; the rest are civilians (general lecturers, laboratory and simulator technicians):
AcademyPosts (0 / 50% / 100%)Officers and NCOsUniversityCivilians
I. Cadet school10 / 13 / 178 / 11 / 13 (80%)—2 / 3 / 3
II. Technical academy80 / 107 / 13332 / 43 / 53 (40%)20 / 27 / 33 (25%)28 / 37 / 47
III. Fleet cadet school12 / 16 / 209 / 12 / 15 (75%)—3 / 4 / 5
IV. Fleet technical academy40 / 53 / 6716 / 21 / 27 (40%)10 / 13 / 17 (25%)14 / 19 / 23
Total142 / 189 / 23765 / 87 / 10830 / 40 / 5047 / 62 / 79
  • Cost to the academy budget — the salaries of seconded officers and NCOs are already in the armed forces’ personnel budget, so they are taken out of the academy cost (35 000 AC per post plus the 10% administration share). The formulas above remain the full cost; the cost charged to the academy’s own budget is (mln AC/year, N = students of that academy):
AcademyFormulaAt 50% (now)At 100%
IK = 0.264 + 0.00293 · N0.410.56
IIK = 3.652 + 0.00500 · N5.156.66
IIIK = 0.935 + 0.00788 · N1.171.41
IVK = 3.095 + 0.00717 · N4.175.25
All fourK = 7.95 + 0.00559 · N (N = all students)10.913.9
  • Strain on the armed forces: the seconded officers and NCOs are 65 posts at the base, 87 at 50% and 108 at full strength, i.e. about 2–3% of the current ~3 600 personnel (and 1.5% of the target ~7 000). The armed forces lack an established officer and training cadre (see MIL_ARTALAN_ARMED_FORCES), so these secondments are felt in the units; at the start the share of officers can be lower, with veterans of Saney and the FPC filling the posts.
  • Per service branch (if needed): the Army and the Marines share parts I and II 70/30 (5.33 / 2.29 at 50%, 6.84 / 2.93 at 100%), the fleet takes parts III and IV (6.63 at 50%, 8.26 at 100%).
  • Assumptions: students per teaching post 6 / 5 / 3 / 5 for parts I / II / III / IV, 35 000 AC per post (the military pays all salaries, university staff included); fixed share of the cost 60% for staff, 70% for equipment upkeep, 80% for simulator upkeep, 100% for buildings; upkeep 50 AC/m² for buildings, 4% of value for equipment, 3% for simulators (mostly stationary mock-ups of the bridge, reactor, generator etc., cheap to maintain after the high cost of building them); consumables 2 000 AC per student in the land parts and 3 000 AC in the fleet parts; administration 10%.
  • University staff and research: 25% of the staff of the two technical academies come from Caledonian University on research-and-teaching posts (60% of time teaching, 40% research), so the technical academies need 1/0.9 of the teaching-only posts; the research share is 10% of the technical posts, with 15 000 AC of materials per research post.
  • Planned in MIL_ARTALAN_ARMED_FORCES (Military Infrastructure).

Artalan military orbital station — rebuild in four stages (Artalan, mln AC ≈ CC)

Rebuild of a smaller existing station, brought into Artalan’s orbit from elsewhere, into the Artalan Space Navy’s main orbital base, Artalan Starbase (Space Infrastructure); nearly finished, mostly paid. Four stages, 175 mln in total. Unit prices are consistent with the other entries: reactor at 0.01 mln per MW of total power (here 2 000 MW), structure at 2 mln per kt (a ring of 40 mln is ~20 kt, a small ring of 10 mln ~5 kt), large dock at 10 mln as in the transshipment station calculations, comms 2 mln.

StageContentsCost (mln)
1small ring 10, reactor 20, dock 5, 5 PD railguns 2.537.5
2small-ring adaptation 5, conversion of a large old habitat module into the command section 5, comms 2, sensors 3, 2 docks 10, 2 railguns 10, EW 237
3ring 40, fuel expansion 5, 2 railguns 10, 5 PD railguns 2.557.5
4ring adaptation 25, large dock 10, 2 EW 4, 2 launchers 443
Total175
  • Unit prices (mln): dock 5; large dock 10; small ring 10, its adaptation 5; ring 40, its adaptation 25 (a fit-out is 50–62% of the structure); reactor 0.01 per MW of total power; comms 2; sensors 3; EW module 2; railgun 5; PD railgun 0.5; launcher 2; fuel expansion 5; conversion of an old habitat into the command section 5.
  • Final configuration: 3 docks and 1 large dock, a ring and a small ring, a 2 000 MW reactor, 4 railguns, 10 PD railguns, 3 EW, 2 launchers, a command section, comms, sensors and expanded fuel storage.
  • The EW modules are priced as a general figure; with the Artalan premium for imported advanced electronics (see the note under Defensive platforms) the three would cost about 1.2 mln more.
  • An alternative three-stage plan (177 mln) exists in the sheet but was not chosen; the proposed stations at A3 and the Gamma point (168.5 and 76.5 mln) are player proposals, not canon.

Artalan military orbital station — further expansion in four stages (Artalan, mln AC ≈ CC)

A further expansion of the Artalan Starbase, to start after the four-stage rebuild above (175 mln). Planned, not started. Four stages, 114 mln in total. Unit prices as in the entries above (docks, shuttle docks 3 with a trunk line / 0.5 passenger, railguns, EW, launcher battery 2) and in the proposed stations below (workshop, tank, pumps).

StageContentsCost (mln)
1removal of the present end of the spire, extension of the spire, added fuel tanks15
2building the docks, rebuild and completion of the supply infrastructure35
3workshop section with shuttle docks, warehouses36
4defence module28
Total114
  • Additions when finished: 3 destroyer docks and 1 cruiser dock; an extra section of workshop, warehouse and fuel station with a tank for a further 100 kt (the workshops can serve at least two ships at once; fuel is taken at the dock); 5 PD railguns; an extra connector with a defence module: 5 PD railguns, 2 rotating destroyer railguns, a missile section for about 50 small LANC and 4 EW modules (Fenris modules only); warehouses with supplies for 5 destroyers and 2 cruisers in total; landing pads for large shuttles at the workshops.
  • Check against unit prices (estimates, not from the sheet):
    • Stage 1: tank 100 kt 6 (shell of 3% of the capacity, 2 mln per kt) + spire extension of a few tens of metres, reinforced to carry docks, ~3 kt (assumed 20 m across) 6 + removal and transition ~1.5 = 13.5.
    • Stage 2: docks 25 (3 destroyer docks 15, cruiser dock 10) + supply infrastructure 5 (2 × 2.5: pumps and lines of the new section, reinforcement of the central supply line so that it reaches the whole station) + 5 PD railguns 2.5 (assumed with the docks) = 32.5.
    • Stage 3: workshop 18 (twice the A3 workshop, for a station twice as large: hull 4 kt = 8, equipment 10) + shuttle docks 13 (4 transport docks with a trunk line at 3, 2 passenger docks at 0.5) + warehouses and missile stores 5 = 36.
    • Stage 4: 5 PD railguns 2.5 + 2 rotating destroyer railguns 10 + launcher battery 2 + 4 EW 8 + magazine for 50 small LANC 2 + connector ~3 = 27.5.
    • The rest of each stage (1.5, 2.5, 0, 0.5) is a reserve.
  • Warehouses (5 mln): supplies of the crews (~500 people, 90 days: ~135 t) and spares (~1% of the dry mass of the ships, ~2 kt) take about 2 mln; the rest is a missile store of about 450 t, i.e. ~75 small LANC at the 6.7 mln per kt of the A3 magazine. Each further kt of missiles adds about 6.7 mln.
  • Not included: ammunition and missiles bought for the stores, the first fill of the new 100 kt tank (10 mln at 0.1 mln per kt), the 50 small LANC of the defence module (~17 mln at the NAMS price of 0.34 mln each).

Proposed military stations at A3 and the Gamma point — new build (mln CC ≈ AC)

Player proposals, not canon and not planned. Priced as new builds, not as rebuilds of an existing station (unlike the Artalan station above): a new station also needs its own core. Prices of the modules follow the entry above, the Fenris EW module is the Static EW Installation of Fenris Computer Systems (2 mln CC). The cost of getting the station to its place (towing a station built in the orbit of Artalan, or building on site far from the planet) is not included and is still to be worked out.

ItemGammaA3
Docks (destroyer 5, cruiser 10)2 destroyer docks: 102 destroyer docks and 1 cruiser dock: 20
Shuttle docks (2 transport with a trunk line at 3, 2 passenger at 0.5)77
Command module1020
Habitat ring, fitted out (2 mln per kt, fit-out 62.5%)ring 4 kt: 8 + 5 = 13ring 7.5 kt: 15 + 9.4 = 24.4
Workshop and warehouse (hull 1 / 2 kt = 2 / 4, equipment 5 / 5), fuel pumps and transfer lines 2.5, fuel tank (shell of 3% of the capacity, 2 mln per kt: 1.5 / 3 kt = 3 / 6)tank 50 kt: 12.5tank 100 kt: 17.5
Reactor (0.01 per MW of total power)1 500 MW: 152 000 MW: 20
Comms 2, sensors 5 (better for stations far from the planet)77
5 PD railguns (0.5 each)2.52.5
EW modules from Fenris (2 each)2: 43: 6
Rotating destroyer railguns (5 each)2: 102: 10
Launcher battery (2) and magazine for 50 small LANC (2)—2 + 2 = 4
Station core17.525
Total108.5163.4
  • Not included: the first fill of fuel at 0.1 mln per kt, i.e. 5 mln (Gamma) and 10 mln (A3); 50 small LANC missiles for A3, ~17 mln at the NAMS price of 0.34 mln each.
  • Station core (the part left over after the modules the player named): pressurised connectors between the dock section, the command module and the ring, the hub of the ring, a reactor bay, radiators, life support, power distribution, a station-keeping drive, fuel lines and airlocks. Estimated mass and volume: Gamma ~3.0 kt and ~8 400 m³, A3 ~5.7 kt and ~19 000 m³ (including a 20% structural margin). Assumptions, none of them canon: reactor with shielding 0.7 t per MW of total power, life support 2.5 t per person for ~100 (Gamma) and ~250 (A3) people, radiators sized at 2 MW/m² of heat (750 and 1 000 m²), pressurised corridors of 4 × 4 m and 5 × 5 m, 150 m and 250 m long. Cost: structure at 2 mln per kt of the core without the reactor (3.5 and 8), equipment 10 and 12, station-keeping drive and radiators 4 and 5.
  • Magazine for 50 small LANC: a missile is 6 m long, 6 t and 1 m in diameter (see the Skadi card), i.e. 300 t and about 21 m² of magazine area; the 2 mln is for the structure, loading mechanism and blast protection.
  • Habitat ring: sized for the peak, not for the station crew (under 50 people): the crew plus the full crews of the ships at the docks (Hawk 47, cruiser ~100), 70 m³ per person (WORKFORCE_REFERENCE: 60–80) and 0.35 kt per 1 000 m³ (living quarters of the small shipyard). Gamma: 50 + 2 × 47 = 144 people, 10 100 m³, 3.5 kt; A3: 50 + 2 × 47 + 100 = 244 people, 17 100 m³, 6.0 kt. A margin for what is not foreseen brings the rings to 4 kt and 7.5 kt. The fit-out is taken at 62.5% of the structure as for the Starbase ring (the small ring there is 50%, which would make Gamma’s ring 12). The core still assumes ~100 and ~250 people for life support.
  • Workshop and tank: the workshop is a hall for spare parts, ammunition and minor repairs, not a yard: 1 kt (~4 000 m³) at Gamma and 2 kt (~8 000 m³) at A3, at 0.25 kt per 1 000 m³ as in the small shipyard. The tank is a welded shell without compartments or fit-out, so only its mass is priced at the hull anchor (2 mln per kt): 3% of the capacity, i.e. a shell of centimetres, not millimetres (a 5 mm shell of a 50 kt tank would be only 0.14–0.4 kt). The pumps and transfer lines are priced separately (2.5).
  • Dry mass of the finished stations, before the fuel is loaded: about 16 kt (Gamma) and 30 kt (A3).
  • Compared with the plans in the sheet (rebuild values: 76.5 and 168.5): the new builds add the workshop section with the tank, the magazine and the shuttle docks, the station core and the better sensors, and A3 loses the small ring.
  • The existing fuel point at the Gamma point (3 kt and a service module, see Artalan Corporation) would be replaced or taken over by the tank of the new station.