Guidelines for building the budget of a significant company from its order book, with one worked example from canon. A method and a set of checks, not a table of rates. Companion to WORKFORCE_REFERENCE (crew, wages, rotations) and PRICE_REFERENCE (prices).
Caveat: single case, not generalisable. Every figure below comes from one yard on the periphery, Faringor Spaceworks, with its own conditions: a 10% import premium, import duties, insurance from Newton Consortium, a resident crew on a 14/14 rotation, a 30% state shareholder and demand created by the FPC’s withdrawal from the sector. The rates, ratios and cost categories are specific to that yard. Use this file for the order of the steps and the checks, and derive every rate again for another company.
Status: one worked example (Faringor Spaceworks) and one partial anchor (Trident Shipyard). Sections marked TODO are not yet filled.
Scope
Use this when a company card needs a budget (profit by year, a cost breakdown, a split between shareholders) and the company is significant enough for the numbers to matter: a recurring order book, a notable share of a state’s economy, a stake held by a canon actor. For minor firms [Unknown] remains acceptable.
Method
- Order book. List the work per production unit (dock, line, plant): period, work type, customer, duration. Count the months with income against the months available (utilisation). Months spent on the company’s own expansion earn nothing but are real cost.
- Profit per contract, then per unit-month. Take (or agree on) a profit per contract after materials, wages and overheads, before tax. Divide by the months the contract occupies a unit. The ordering should follow complexity and risk; a rate out of order (a repair that pays more than any build) is a signal to revisit the rate.
- Annual profit. Book each contract in proportion to the months worked in the year. Forward contracts count separately from work done.
- Price and cost of one unit. Base cost comes from the equipment sheet (
helper-code/ship_designer.py, rates inhelper-code/ship_costs.toml): the TOTAL line is the sum of components times 1.35. The seller’s price is a second 1.35 on that base cost. For a system that must import, raise the material cost (Faringor: +10%). What is left, price minus materials minus profit, is the remainder to explain. - Break down the remainder into payroll (from WORKFORCE_REFERENCE), operation of the facility, duties and insurance, depreciation, losses and extras. Check that the sum matches the remainder; if it overshoots or falls short, adjust the categories, not the profit.
- Tax and distribution. Apply the corporate tax of the state (Faringor: 15% assumed), then split the net profit by shareholding. Treat full payout as an upper bound.
- Checks. Valuation divided by pre-tax profit, revenue as a share of the state’s GDP, the state’s take (tax plus dividend) as a share of profit, and profit as a share of the state’s corporate accumulation in
data/economy.
What is not a cost
Financing of work in progress and of imported stock is working capital. It limits how much work the company can take on (more capital, more turnover), but it is not booked as a cost here.
Pitfalls
- Do not read a constant remainder as evidence. When price, cost and profit follow fixed rules, the remainder is the same share of the price by construction (about 10–11% at Faringor). It says nothing about whether the costs are fixed or proportional.
- Do not count the import premium twice. A cost that already includes the premium must not receive it again as an explanation of the remainder.
- Payroll per unit depends on load. Divided across a full year of work, wages are about 2.5% of the price of builds; “10 mln per ship” holds only at the capacity ceiling.
- Check which of two base costs is meant. The sheet’s Subtotal (components) and TOTAL (Subtotal × 1.35) differ by 35%.
Worked example: Faringor Spaceworks (2455)
Figures in mln CC, the owner’s working estimates. The dock calendar, the cost table and the workforce are in the company card.
Profit per contract
| Work | Profit | Dock time | Per dock-month |
|---|---|---|---|
| Destroyer, Leopard | 68.75 | 7 months | 9.8 |
| Destroyer, Hawk | 57.5 | 6–7 months | 8.2–9.6 |
| Landing ship | 92 | 9 months | 10.2 |
| Frigate, Model C | 42.5 | 6 months | 7.1 |
| Tanker | 31 | 6 months | 5.2 |
| Freighter | 29 | 6 months | 4.8 |
| Repair (freighter, tug) | 5 per month | — | 5.0 |
| Destroyer rebuild/repair | 10 per month | — | 10 |
Operating profit by year (pre-tax): 2453 about 139 (without a tanker finishing in dock one), 2454 about 116 (dock three built by the yard’s own crews), 2455 about 243, 2456 about 230 (contracted).
Price and cost of one unit
| Unit | Base cost (sheet TOTAL) | Material cost (+10%) | Price | Profit | Remainder |
|---|---|---|---|---|---|
| Destroyer, Hawk | 555 | about 611 | 750 | 57.5 | about 81 |
| Landing ship | 900 | 990 | 1 215 | 92 | 133 |
| Tanker | about 300 | about 330 | 400 | 31 | about 39 |
Breakdown of the remainder on builds (about 236 in 2455)
| Item | mln CC | Note |
|---|---|---|
| Payroll | 56 | 1 512 positions × 37 000 CC |
| Operation of the station | about 50 | the Trident anchor below gives 35–38; the rest is the resident crew |
| Import duties | about 50 | about 3% of materials |
| Insurance | about 30 | Newton Consortium; high-risk zone |
| Depreciation | about 30 | printers, robots, cranes, dock lines |
| Material losses and gaps in documentation | about 20 | failed prints, rework, designs acquired without full papers |
| Extra crew costs | a few | rotation shuttles, safety gear, training |
Distribution (2455, tax 15% assumed, full payout): pre-tax about 243, tax about 36.5, net about 207; state (30%) about 62, Artalan Corporation (15%) about 31, other shareholders (55%) about 114. The state’s take is about 98, roughly 40% of the pre-tax profit.
Checks: valuation of about 1.47 bn CC is 6× the 2455 pre-tax profit (9–10× on the 2453 profit, when the stake was bought); revenue from builds of about 2.2 bn CC is about 11.5% of Faringor’s GDP, most of it exported; profit is about 9% of the state’s corporate accumulation (2.66 bn CC in 2455).
Anchors
| Entity | Year | Notes |
|---|---|---|
| Faringor Spaceworks | 2455 | three destroyer docks; pre-tax profit about 243; the example above |
| Trident Shipyard | 2455 | start-up year on Nilus: revenue about 11, parts about 5, payroll 4.6, other costs about 2.9, loss of 1–2; other costs are 0.63 × payroll, about 25 000 CC per employee |
How to add an entry
- Record the caveat of the case next to the numbers: what is specific to the company (location, imports, crew model, ownership).
- Put the full calendar and the tables in the company card; keep this file to the method and one line per anchor.
TODO
- A second worked example from a different industry (extraction, refining, logistics) to separate what is general from what is specific to a shipyard.
- Corporate tax and import duties for polities other than Faringor.
- Insurance and depreciation rates once more than one anchor exists.